        "title": "Canada Bitcoin Mining Regulatory Status",
        "description": "Is Bitcoin mining legal in your Canadian province? Yes everywhere — the constraint is grid access. This reference covers all 13 provinces/territories: legality, new-connection status (BC ban, Manitoba pause, Quebec cap + mandatory Rate CB blockchain tariff) and regulator. Filter with ?jurisdiction= (two-letter province code such as QC, or a province name) or ?grid_access=.",
        "generated": "2026-07-13T22:47:45+00:00",
        "version": "1.0",
        "license": "https://creativecommons.org/licenses/by/4.0/",
        "license_name": "CC BY 4.0",
        "source": "https://d-central.tech/canada-bitcoin-mining-rules/",
        "record_count": 13,
        "disclaimer": "Status as of early 2026; rules change. Mining is legal Canada-wide — these are grid-connection / power-allocation policies, not bans on the activity itself. Verify the current rule with the relevant utility/regulator. Not legal or investment advice."
    },
    "rows": [
        {
            "jurisdiction": "Quebec",
            "province_code": "QC",
            "mining_legal": "Yes",
            "grid_access": "Capped & allocated",
            "regulator": "Hydro-Québec / Régie de l'énergie",
            "note": "Mining is legal, but the economics are set by a dedicated tariff, not by Quebec's famous cheap industrial power. Hydro-Québec's Rate CB (Electricity Rates schedule, Chapter 7, 'Rate for Cryptographic Use Applied to Blockchains', effective April 1, 2026) is MANDATORY for any annual contract with at least 50 kW of installed capacity dedicated to cryptographic use, and Art. 7.1 bars that customer from the Industrial Revitalization Rate, Load Retention Rate, D-R Commitment Option, Additional Electricity Option and Economic Development Rate — so a miner cannot elect Rate L (3.821 c/kWh) or Rate M. Rate CB prices only 'authorized' consumption cheaply (4.324 c/kWh large power); Art. 7.2 freezes authorized capacity to what was held or confirmed before June 7, 2018 or won through an allocation award, so a NEW miner's entire energy draw bills at 18.767 c/kWh — roughly 4.9x Rate L. Service is non-firm: curtailable to 5% of peak for up to 300 h/year (Art. 7.9). A block of electricity is reserved for cryptographic use applied to blockchains, but allocation from that block is PROVISIONALLY SUSPENDED: Hydro-Québec asked the Régie de l'énergie to suspend the allocation process while the number of megawatts involved is reassessed, and the Régie approved the suspension in a decision issued January 10, 2023 (docket R-4210-2022). A new Quebec miner therefore cannot currently obtain authorized capacity. See d-central.tech/hydro-quebec-electricity-rates/ for the full rate table."
        },
        {
            "jurisdiction": "British Columbia",
            "province_code": "BC",
            "mining_legal": "Yes (existing only)",
            "grid_access": "New connections banned",
            "regulator": "BC Hydro / BCUC",
            "note": "BC is permanently banning new crypto-mining grid connections (moratorium from Dec 2022, now made permanent); existing sites continue. Canada's most restrictive province."
        },
        {
            "jurisdiction": "Manitoba",
            "province_code": "MB",
            "mining_legal": "Yes",
            "grid_access": "New large-scale paused",
            "regulator": "Manitoba Hydro",
            "note": "Moratorium on new large-scale crypto-mining grid connections since Nov 2022 (extended through 2026); proposed higher rates and peak-time curtailment for data centres."
        },
        {
            "jurisdiction": "Alberta",
            "province_code": "AB",
            "mining_legal": "Yes",
            "grid_access": "Standard process (permissive)",
            "regulator": "AESO / AUC",
            "note": "Deregulated electricity market and among Canada's most crypto-mining-friendly provinces, with active behind-the-meter and flare-gas operations."
        },
        {
            "jurisdiction": "Ontario",
            "province_code": "ON",
            "mining_legal": "Yes",
            "grid_access": "Standard process",
            "regulator": "IESO / OEB",
            "note": "No crypto-specific moratorium; subject to normal industrial connection processes, grid conditions and rates."
        },
        {
            "jurisdiction": "Saskatchewan",
            "province_code": "SK",
            "mining_legal": "Yes",
            "grid_access": "Standard process",
            "regulator": "SaskPower",
            "note": "No crypto-specific moratorium known; standard industrial connection process."
        },
        {
            "jurisdiction": "New Brunswick",
            "province_code": "NB",
            "mining_legal": "Yes",
            "grid_access": "Standard process",
            "regulator": "NB Power",
            "note": "No crypto-specific moratorium known."
        },
        {
            "jurisdiction": "Nova Scotia",
            "province_code": "NS",
            "mining_legal": "Yes",
            "grid_access": "Standard process",
            "regulator": "Nova Scotia Power",
            "note": "No crypto-specific moratorium known."
        },
        {
            "jurisdiction": "Newfoundland & Labrador",
            "province_code": "NL",
            "mining_legal": "Yes",
            "grid_access": "Standard process",
            "regulator": "Newfoundland and Labrador Hydro",
            "note": "Abundant hydro; no crypto-specific moratorium known."
        },
        {
            "jurisdiction": "Prince Edward Island",
            "province_code": "PE",
            "mining_legal": "Yes",
            "grid_access": "Limited capacity",
            "regulator": "Maritime Electric",
            "note": "Small grid with limited spare capacity for large continuous loads."
        },
        {
            "jurisdiction": "Yukon",
            "province_code": "YT",
            "mining_legal": "Yes",
            "grid_access": "Limited capacity",
            "regulator": "Yukon Energy / ATCO Electric Yukon",
            "note": "Small, isolated grid; very limited capacity for mining loads."
        },
        {
            "jurisdiction": "Northwest Territories",
            "province_code": "NT",
            "mining_legal": "Yes",
            "grid_access": "Limited capacity",
            "regulator": "Northwest Territories Power Corp.",
            "note": "Remote, capacity-constrained grids."
        },
        {
            "jurisdiction": "Nunavut",
            "province_code": "NU",
            "mining_legal": "Yes",
            "grid_access": "Impractical",
            "regulator": "Qulliq Energy Corp.",
            "note": "Diesel-dependent remote grids; impractical for mining."
        }
    ]
}