DCENT_OS is D-Central Technologies' GPL-3.0 open-source Bitcoin mining firmware for selected Bitmain Antminer ASIC miners. This directory contains signed experimental artifacts for the exact S9 Zynq/XIL and S19j Pro Zynq/XIL lanes. Package signing and offline update-path tests do not prove a generally validated first installation.
| File | Target | SHA-256 |
|---|---|---|
| DCENTOS_XIL1_S9_beta20260709.tar | Antminer S9 (Zynq, BM1387) — A/B sysupgrade | e0bd9e30c7277a86f0c601bb882f41a7dd311160e29d7aefc4e017d2454ab845 |
| DCENTOS_XIL3_S19jPro_beta20260709.tar | Antminer S19j Pro (Zynq / XIL, BM1362) — A/B sysupgrade | e7afc67cd9f7c9cda0bcd329f61116ef352644c3ae707741e04e1e1e5e7b2a96 |
| DCENTOS_XIL1_S9_SD_beta20260709.img | Antminer S9 — bootable SD-card image (64 MB) | 1c61fde315ce6eadcef5df79690ed15558173c96216680970f8de3360081b266 |
| SHA256SUMS.txt / BETA_RELEASE_SHA256SUMS.txt | checksums | — |
Each sysupgrade package embeds a signed manifest verified against the beta release public key
26985575eae77d56c490ceeb9054af012eab5ae59119cd20eaa70dd7e722df83. Confirm checksums with
sha256sum -c SHA256SUMS.txt.
Do not treat the presence of a file as a general install instruction. Review the release evidence record, the exact model/control-board ledger, and the recovery guide before any persistent write.
Verify SHA256SUMS.txt and the signed manifest. Operators of production or revenue-critical hardware should use mature production firmware.
© D-Central Technologies — GPL-3.0 project components. Experimental artifact set 20260709.