Optimal Environmental Conditions for Operating ANTMINERs

Table of Contents

This document serves as a comprehensive guide outlining the optimal environmental conditions required for the efficient operation of your ANTMINER servers. Adhering to these guidelines will ensure optimal performance and longevity of your mining hardware.

Climatic Parameters

The following climatic conditions should be maintained for the optimal operation of your ANTMINER servers:

Criteria | Desired Condition

  • | – Operational Temperature | Between 0-40℃ Operational Humidity | Between 10-90%RH, non-condensing Storage Temperature | Between -20-70℃ Storage Humidity | Between 5-95%RH, non-condensing Altitude | Less than 2000m

Location Criteria for the Server Operations Room

The operations room housing your server should ideally be situated away from sources of industrial pollution. The requisite distances from different types of pollution sources are as follows:

  • For severe pollution sources such as smelters and coal mines, maintain a minimum distance of 5km.
  • For moderate pollution sources including chemical industries, rubber, and electroplating industries, ensure a minimum distance of 3.7km.
  • For light pollution sources such as food factories and leather processing factories, maintain a minimum distance of 2km.

If it is impossible to maintain these distances, choose a site that is perennially upwind of the pollution source.

Avoid setting up your server operations room within 3.7km of the seaside or salt lakes. If this is not possible, your facility should be made as airtight as possible and equipped with air conditioning to provide adequate cooling.

Electromagnetic Environmental Conditions

Keep your operations room away from transformers, high-voltage cables, transmission lines, and high-current equipment. For instance, no high-power AC transformers (>10KA) should be within 20 meters, and no high-voltage power lines should be within 50 meters of your operations room.

In addition, avoid locating your operations room near high-power radio transmitters. Specifically, no high-power radio transmitters (>1500W) should be within 100 meters of your operations room.

  1. Supplementary Environmental Guidelines:

The server operations room should be void of explosive, conductive, magnetically conductive, and corrosive dust. The requirements for mechanically active substances are outlined below:

Criteria for Mechanical Active Substances

Mechanical Active Substance | Standard

  • | – Sand | Maximum 30mg/m3 Suspended Dust | Maximum 0.2mg/m3 Deposited Dust | Maximum 1.5mg/m2h

Standards for Corrosive Gas

Corrosive Gas | Unit | Maximum Concentration

  • | – | – H2S | ppb | 3 SO2 | ppb | 10 Cl2 | ppb | 1 NO2 | ppb | 50 HF | ppb | 1 NH3 | ppb | 500 O3 | ppb | 2

Note: ppb (part per billion) is a unit of concentration where 1ppb denotes the volume ratio of one part per billion.

For further inquiries or assistance, don’t hesitate to contact us.

Share the Post:

DISCLAIMER: D-Central Technologies and its associated content, including this blog, do not serve as financial advisors or official investment advisors. The insights and opinions shared here or by any guests featured in our content are provided purely for informational and educational purposes. Such communications should not be interpreted as financial, investment, legal, tax, or any form of specific advice. We are committed to advancing the knowledge and understanding of Bitcoin and its potential impact on society. However, we urge our community to proceed with caution and informed judgment in all related endeavors.

Related Posts

High Demand: Shipping & Support Delays

Thank you for your incredible support and enthusiasm! Due to unprecedented demand, our shipping and support times may be slightly longer than usual. We’re actively expanding our team to fulfill your orders faster and provide you with the service you deserve.

Every order we receive is a powerful signal that the Bitcoin community is thriving. Your support is directly contributing to the resurgence of Bitcoin infrastructure and innovation—especially in pleb mining, where D-Central has proudly led since 2016. Together, we’re fueling decentralization and empowering miners everywhere.

We’re seeing record demand, and supplies are running low on many of our popular items. With rising resourcing costs, prices are expected to increase in the coming weeks. Placing your order now not only secures your product and locks in today’s pricing but also directly contributes to regrowing D-Central's team and strengthening the Bitcoin mining ecosystem.

Thank you for being part of the D-Central community. Your trust and support fuel our mission to keep Bitcoin mining accessible and innovative.