4479 Desserte Nord Autoroute 440, Laval, QC H7P 6E2

Avalon A11&A12 Series Miner Disassembly Guide

Table of Contents

This technical document serves as a guide for the disassembly of Avalon A-Series Products. It provides step-by-step instructions, recommended tools, and important considerations for authorized maintenance centers or other authorized customer service centers. Following this guide will assist in the proper installation or disassembly of Avalon A-Series Miners.

  1. General:
  • The purpose of this guide is to aid in the installation or disassembly of Avalon A-Series Products.
  • The guide applies to the following miners:
    • Avalon A1246-87/-85/-81
    • Avalon A1166Pro-81/-78/-75/-72/-68
    • Avalon A1066Pro-64-L/-60-L/-56-L
  1. Applicable Users:
  • This guide is intended for use by authorized maintenance centers or other authorized customer service centers.
  1. Notification of Reading:
  • This document contains text and images. Adjust the screen resolution as per personal preferences.
  1. Recommended Tools:
  • 1x Drill
  • 1x PH2 Hex Shank Screwdriver Bits
  • 1x Anti-static wristband
  • 1x Anti-static gloves
  • 1x Anti-static outfit

Caution: Before disassembling the machines, please wear the recommended anti-static wristbands, gloves, and clothes. Ground the wristbands correctly and apply the proper amount of torque to the screw fasteners.

Disassemble Procedures: Step 1:

  • Disconnect the power supplies of Fan3 and Fan4.
  • Remove the two fixed screws.
  • Push the lid in the direction indicated by the red arrow to remove it.

Step 2:

  • Remove all the connectors between the Hash boards and the MM board.

Step 3:

  • Unplug the power supply connector (small white).
  • Unplug the temperature control connector (large white).
  • Unplug the fans control connectors (black).
  • Press and hold Fan1 and Fan2’s connectors, then unplug them.

Step 4:

  • Remove the two fixed screws attached to the MM board and safely take out the MM board.

Step 5:

  • Remove the ten fixed screws attached to the two aluminum strips, and then remove the aluminum strips.
  • Remove the front and rear fixed screws (12 in total) following a diagonal order to detach the front and rear panels with fan assemblies.

Step 6:

  • When removing the components of Fan1 and Fan2, be cautious of the temperature control cable and carefully take it out through the opening to prevent damage.

Step 7:

  • Push a hash board in the indicated direction and pull out the three hash boards one by one. Ensure the miner’s frame is held firmly to avoid toppling.

Step 8:

  • Take out the fixed screws (18 in total) and remove the heat sinks of the hash boards on both sides. A hash board comprises three heat sinks at the rear and one at the front.

Step 9:

  • Additional Information: There are two slots on both sides of the front heat sink. Ensure those slots are aligned correctly.

Step 10:

  • Additional Information: Apply silicon thermal grease (2W/m∙K) evenly on the chips of the hash board.
  • Place the power supply on top and align the clip with the framework.
  • Press down the clip and move the power supply away from you.

Step 11:

  • Additional Information: The hooks on the framework correspond to the openings on the bottom of the power supply. Align the clip and power supply with the framework, then push the power supply box towards you until it clicks.

This Avalon A-Series Disassemble Guide provides detailed instructions for authorized maintenance centers or customer service centers to safely and effe

Share the Post:

DISCLAIMER: D-Central Technologies and its associated content, including this blog, do not serve as financial advisors or official investment advisors. The insights and opinions shared here or by any guests featured in our content are provided purely for informational and educational purposes. Such communications should not be interpreted as financial, investment, legal, tax, or any form of specific advice. We are committed to advancing the knowledge and understanding of Bitcoin and its potential impact on society. However, we urge our community to proceed with caution and informed judgment in all related endeavors.

Related Posts

High Demand: Shipping & Support Delays

Thank you for your enthusiasm! Due to increased demand, our shipping and support times may be longer than usual. We’re actively training additional staff to get orders out faster and provide the support you deserve. Thank you for your patience and understanding as we grow to meet your needs.