Description
Bitaxe Ultra 207: planned populated board
Informational listing — purchasing unavailable. This page describes a planned D-Central stock configuration based on Bitaxe Ultra 207. The intended configuration is a factory-assembled circuit board with every required non-ASIC board component fitted and the Bitcoin mining ASIC excluded. Assembly and package contents remain under verification.
A board without its required ASIC cannot mine. This planned configuration should not be treated as a complete working miner or as confirmation that assembled units are currently available.
Exact hardware source
The design basis is Bitaxe Ultra 207, pinned to upstream commit 25b6124cde4a4a4e798f94cfef6f8b321ae8785b in the Bitaxe project. The revision source and board design file identify this specific hardware revision. The upstream design specifies 1 BM1366 ASIC chip; that chip is excluded from the intended board configuration.
Upstream source attribution: Bitaxe project contributors. The license file at this pinned revision contains CERN-OHL-S-2.0. Source availability does not establish that a manufactured board has been assembled or tested.
What remains to be verified
The current source audit has unresolved PCB design checks and component-population or part-identification questions. Engineering review and supplier acceptance remain pending.
The non-ASIC bill of materials, placement files, do-not-populate entries, through-hole parts and supplier assembly capability are being checked. Controller or display modules, connectors and headers must be accounted for before the board can be described as complete except for its ASIC.
The final package contents have not been confirmed. Do not assume that a power supply, cooling hardware, display, cables, stand or other accessories are included. The finished listing will identify what is fitted, excluded or supplied separately.
Price and stock
No orders are accepted through this listing. Price and stock availability are not yet confirmed. Purchasing will remain unavailable until the required manufacturing, cost and receipt checks are complete.