Québec Bitcoin Mining — Power, Rates, Rules & Local Services
🇫🇷 En français : Réparation ASIC et achat de mineurs au Québec & à Laval
Everything for Bitcoin mining in Québec — Hydro-Québec rates, the regulatory rules, data-sovereignty laws, and hands-on repair and AI consulting from D-Centrals Montreal bench, grouped by theme.
Quick answer
Québec is one of the best places on earth to mine Bitcoin: abundant, cheap hydroelectric power, a cold climate that helps cooling, and the lowest industrial power rate in North America — 3.821 ¢/kWh on Rate L. A Bitcoin miner cannot buy power at that price. Any load with 50 kW or more dedicated to blockchain work is barred from Rate L and billed on Rate CB instead, where energy outside your authorized allocation costs 18.767 ¢/kWh — roughly 4.9× Rate L — on a non-firm contract that Hydro-Québec may curtail for up to 300 hours a year on two hours of notice. New allocations from the dedicated block have been suspended since the January 2023 Régie decision, so the real question in Québec is not what power costs; it is whether you can get an allocation at all. This hub gathers D-Central's Québec resources: the exact rates, the rules, the data-sovereignty laws, and hands-on repair and consulting from our Montreal bench.
Cheap hydro + cold climate make Québec ideal for mining — but power allocation is capped. Start with the rates and rules below, then talk to a local team that actually mines and repairs here.
Power & rates
Québec has North America's cheapest power — but a Bitcoin miner is not allowed to buy it at that price.
Rules & data sovereignty
Mining is legal in Québec, but Hydro-Québec caps the power allocated to it — and Québec has its own data laws.
Local services (Laval / Montréal)
D-Central is in Montréal, Québec — hands-on repair and sovereign-AI consulting.
Cooling & hydro
Running miners hard — and reusing the heat — in the Québec climate.
See also the full Bitcoin mining in Québec guide and the Canadian provincial guide. D-Central is based at 1325 Bergar, Laval, Québec.
Quebec energy-regulation status
What actually governs Bitcoin-mining electricity in Quebec is not the famous cheap industrial rate — it is a dedicated blockchain tariff, two live rate cases, and a ministerial gate. As of 2026-07-15:
| Instrument | Status | Price / effect | What it means for miners |
|---|---|---|---|
| Rate CB — Rate for Cryptographic Use Applied to Blockchains (Hydro-Québec Electricity Rates, Chapter 7) tariff | In force | 18.767 ¢/kWh on all consumption other than an authorized allocation — a miner with no allocation pays this on every kWh. Inside an authorized allocation: 6.292 / 4.666 ¢/kWh (medium power) or 4.324 ¢/kWh (large power). During a curtailment, consumption above the reduced cap is billed at $1.038/kWh. Effective April 1, 2026. | A new Quebec miner with no grandfathered allocation bills its entire draw at 18.767 ¢/kWh — roughly 4.9× Rate L (3.821 ¢) — and is locked out of the cheap industrial rates. Authorized demand is frozen (Art. 7.2) and service is non-firm: curtailable to 5% of peak for up to 300 h per rate-year on 2 h notice (Art. 7.9). |
| Proposed Rate CB adjustment (3-year transitional pricing for existing cryptographic-use customers) tariff | Under hearingFiled 2026-02-19 · Régie de l'énergie — hearing Fall 2026 · Decision Late 2026 / early 2027 (being challenged) | Would raise Rate CB to an average of about 19.5 ¢/kWh under a 3-year transitional pricing plan for current Rate CB customers. | Existing Quebec miners on Rate CB would see their rate rise toward ~19.5 ¢/kWh on average over a 3-year transition. Proposed and contested — not yet approved by the Régie. |
| Rate CD — proposed rate for large data centres (≥5 MW) tariff | Under hearingFiled 2026-02-19 · Régie de l'énergie — hearing Fall 2026 · Decision End 2026 / early 2027 (requested effective 2026-11-01; operators intend to challenge) | About 13 ¢/kWh on average — roughly double the current large-power rate. | A Bitcoin-mining or AI hashcenter of 5 MW or more would be moved onto Rate CD at ~13 ¢/kWh — about 2× today's large-power price. Proposed; the requested effective date is Nov 1, 2026, subject to the hearing. |
| Bill 69 — An Act to ensure the responsible governance of energy resources and to amend various legislative provisions (2025, chapter 24) statute | In forceFiled 2025-06 | Not a price. Hydro-Québec or any supplier must obtain authorization from the Minister of Economy, Innovation and Energy (MEIE) before serving 5 MW or more to a requester that has no financial-commitment agreement predating December 2, 2022; the Minister may attach economic, social and environmental conditions. The Minister also holds approval authority over crypto-mining electricity demands of 50 kW or more. | Grid access for large loads is now a discretionary ministerial gate, not just a tariff. A new Quebec mining or AI site ≥5 MW needs MEIE authorization (which can carry conditions), and any crypto-mining demand ≥50 kW is subject to ministerial approval — on top of Rate CB and the frozen allocation. Adopted (assented) June 2025. |
| Bill 2 — An Act mainly to cap the indexation rate for Hydro-Québec domestic distribution rate prices (2023, chapter 1) statute | In forceFiled 2023 | Caps the annual indexation of Hydro-Québec DOMESTIC (residential) distribution rate prices. Included for completeness — low direct relevance to miners. | Does NOT set the miner's rate. Miners are on Rate CB (or a commercial rate such as G or M), not domestic Rate D, so this cap does not lower a mining operation's power cost. Listed for completeness only. |
| Dedicated blockchain / crypto electricity allocation block (Rate CB) allocation | Suspended | A dedicated block of electricity — reported at roughly 300 MW (a figure Hydro-Québec now describes as under reassessment) — was reserved by the Régie de l'énergie for blockchain / cryptographic use at Rate CB. The process for granting NEW allocations from that block is suspended. | A new Quebec miner cannot currently obtain authorized capacity: new allocations from the dedicated block have been suspended since early 2023 (Régie de l'énergie, docket R-4210-2022), and Rate CB Art. 7.2 freezes authorized demand to what was already held or won through an allocation award. Without an allocation, the operation's entire draw bills at 18.767 ¢/kWh. |
Download CSV Download JSON REST API →
Pairs with the Hydro-Québec rates dataset and the Canada mining-regulation dataset. Sources are cited per row (Hydro-Québec rate schedule & press releases, Régie de l'énergie, Quebec statutes). Reviewed 2026-07-15; next review 2026-10-01. Not legal advice — verify the current instrument before relying on it.
Related products, repair, and setup paths
- immersion cooling hub
- home immersion cooling guide
- ASIC miners for immersion planning
- ASIC cooling parts
- airflow shroud before immersion
- compare miner specs in the database
- ASIC repair support
Last reviewed July 22, 2026.